A thermal plant with a product attached — bagasse boilers, evaporation, batch pans, vacuum systems, spray ponds and condenser water.
Batch-pan crystallisation and condenser/spray-pond systems represent the largest concentration of recoverable and stabilisable thermal load in the mill. The reference case below is a 14,000 TCD mill on a 110-day season.
| Reference item | Preliminary value | Meaning for deployment |
|---|---|---|
| Plant scale | 14,000 TCD; 560 TPH average crushing; 110-day operating season | Large seasonal thermal and cooling load — a strong candidate for an instrumented pilot. |
| Boiler & power | 230 TPH boiler; 44 MW turbine; 41 MW generation; 26 MW export | Opportunity to stabilise process heat and improve internal energy use. Higher-temperature streams should be assessed for power conversion. |
| Batch-pan thermal load | 132.8 MW(th) gross vapour load; 55.1 MW(th) recoverable/stabilisable under analysis assumptions | Value is strongest around condenser and spray-pond relief, vacuum stability, and process stabilisation. |
| Cooling / contact-water handling | 13.26 million m³/season-equivalent reduction in recirculated and contact-water handling | This is not one-for-one fresh-water saving. Makeup, blowdown, evaporation and wastewater meters must confirm the real water benefit. |
| Pilot scale | 4–6 TESS units on one representative pan; full batch-pan sizing is 48 TESS units | The pan pilot is the correct entry point — full mill deployment is a staged, financed programme, not a first step. |
Target one representative high-load or problem pan. Use 4–6 TESS units after a piping survey and strike profile, then meter vacuum stability, vapour flow, spray-pond temperature, pump kW, strike duration, crystal size, molasses purity, sugar recovery and wastewater.
We would rather send you a data request than a brochure. This is what turns a conversation into a bankable project.
Pan vapour flow, pressure and temperature; strike cycles; vacuum stability; spray-pond and condenser data; pump kW; boiler data; bagasse value; sugar recovery; molasses purity; crystal size; water intake and wastewater; production schedule.
All claims relating to site savings, water reduction, output increase, emissions outcomes, payback, incentives and deployment economics are planning assumptions, analogues or prior-project references — unless and until they are validated for your specific facility through engineering, measurement, vendor quotation, financing documentation, legal review and final commercial agreements.